← Solutions
ILLUSTRATIVE SYSTEM DESIGN

Small office: design around the work

An assumed one-floor 12 × 9 m office for 6 fixed wired desks and 6 laptop users, with a 6-seat meeting room. The plan, cable routes and four systems are explained together so readers can understand each placement.

This hypothetical scenario supports a design discussion. It is not a construction drawing, measured result or project quotation.

Design inputs

  • This is an illustrative pre-survey design, not a real project, construction drawing or acceptance result.
  • The floor is 12 × 9 m with an assumed accessible 3 m ceiling. The origin is the southwest corner; X points east, Y north and Z upward from the floor.
  • The IT room is at X=0–3 m, Y=6–9 m; the meeting room is at X=8–12 m, Y=5–9 m. Door crossings and ceiling paths require confirmation.
  • 12 staff comprise 6 wired-desk users and 6 Wi-Fi laptop users. Meeting seats do not add staff. AP01 is primary; AP02 is a trial point, not an installed item.
  • MDF means the central equipment and cabling rack in the IT room. This one-floor example has no IDF. Equipment roles are specified before a brand or model.
  • Hatching marks Wi-Fi areas to test, not measured coverage or signal values. AC supply, door DC power, reader bus and Internet-provider cable lengths are not yet counted.
  • The assumed 0.9 m entrance opening is X = 1.3–2.2 m, centred at X = 1.75 m. The reader and controller are at the left frame, X = 1.2 m; the inside REX is at (1.2, 0.37, 1.2) m. Equipment sits clear of the door opening.
  • Illustrative door access: one door has an outside reader, inside REX, controller, electromagnetic lock and separate controller/lock DC supplies; no door-state sensor is included. Local DC/control lengths require a survey and are counted separately from network quantities. The closed leaf supports mechanical comparison, not egress simulation.
Assumed 12 × 9 m plan: device positions, ceiling Cat6 routes and Wi-Fi test areas. AP02 is a ceiling trial position, not an installed device. Separately enlarged door views show 3D X/Y positions, entry/exit faces, elevations and separate supplies; symbols are not a take-off scale.
Assumed 12 × 9 m plan: device positions, ceiling Cat6 routes and Wi-Fi test areas. AP02 is a ceiling trial position, not an installed device. Separately enlarged door views show 3D X/Y positions, entry/exit faces, elevations and separate supplies; symbols are not a take-off scale.
3D system model

Building the 3D model…

  • Cat6 / LAN & PoE
  • OS2 fiber
  • 100 V speakers
  • USB or door control signals
  • Lock / controller DC power
  • Dashed: control relationship, not a wiring route

Drag to orbit · Scroll to zoom · Arrow keys to rotate · Home for overview

The model follows hypothetical dimensions and layouts. Select a system to trace its connections. Camera and speaker directions show design targets, not validated coverage. Route strokes are emphasized for clarity, not for reading cable diameters. Close-ups show cable segments near the ports; choose Overview to see the system.
Geometry, placement and connection assumptions
  • Coordinates are metres with Z up. Rooms and the 11 Cat 6 routes retain the office-small reference datums. AP02 is a trial point, not installed equipment.
  • A 27U 0.6 × 0.8 × 1.6 m outer cabinet is a modelling assumption, front toward −Y. The IT room retains 0.9 m front and 0.6 m rear access; check actual conditions.
  • Rack faces use 482.6 mm width and 1U = 44.45 mm. Connection points are route datums, not selected-SKU connector dimensions.
  • AV01 is supported on a side console with a cable-management bridge to the meeting table. USB stays local; no new LAN outlet or permanent link is added. Near-device jacks and patch cords are separated in 3D to reconcile the 24 cord schedule; geometry does not represent service slack.
  • The 0.9 m entrance opening is x = 1.3–2.2 m. The outside reader and inside exit button are at the left frame, x = 1.2 m. This revised assumption keeps equipment out of the walkway without changing Cat 6 quantities.
  • Cameras aim at the entry and circulation as shown on the plan. No face-identification or coverage result is asserted; lenses and lighting remain unselected.
  • Cameras use an illustrative custom rigid 200 mm ceiling drop: an anchoring flange at the 3.0 m ceiling connects to the upper camera mounting plane at 2.8 m. This assumed support is not a manufacturer accessory or selected SKU. Loads, anchors, cable protection and construction details have not been engineered or surveyed. Existing body coordinates, connection datums and cable routes are retained.
  • The small office has no 100 V PA. USB01 is a table speakerphone, not a wall loudspeaker or horn.
  • RELAY-CONTROL depicts only the contact-control relationship between the controller and separately powered lock circuit. The controlReference endpoint is a functional reference, not a physical terminal. This reference is excluded from the equipment schedule and cable quantities; actual wiring, supply, contact ratings and fault behaviour follow the selected equipment and project records.
  • ACS01 uses data-only LAN; PSUACS01 supplies controller DC and PSULOCK01 supplies the lock circuit, outside the PoE budget. READER01 faces the entry approach; EXIT01 is inside for an ordinary exit request, not emergency power release. Reader/REX/DC/relay datums identify functions, not a device terminal diagram. This small-office example has no door-state sensor.
  • The electromagnetic lock and leaf armature are illustrative, assuming a suitably supported leaf/frame. The device model, voltage, current, lock state on power loss and egress circuit are unselected.
  • Door leaves are shown closed to compare lock/armature mechanics, not to simulate operation or egress.
  • The MDF has a 24-position patch panel: 11 terminated runs and 13 unused positions. Optional AP02 requires one position and site validation before installation. The 16-RJ45 switch uses 13 ports, or 14 with AP02. SFP cages have no installed optical modules in this example.
  • Cable-line colors identify functions rather than actual jacket colors. Provisional lengths require a survey and are not measured from the 3D paths. This example has no installed optical link.

Reference documents:

Equipment & proposed cable routes

IDRoleQtyLocationCable / connectionProposed routeConditions
D01Wired desk outlet1West desk 01Fixed solid-copper Cat6; patch cords counted separately15.55 mAllow 19.4 m of fixed cable, including 2 m slack and 10% reserve, rounded per run.
D02Wired desk outlet1West desk 02Fixed solid-copper Cat6; patch cords counted separately14.25 mAllow 17.9 m of fixed cable, including 2 m slack and 10% reserve, rounded per run.
D03Wired desk outlet1West desk 03Fixed solid-copper Cat6; patch cords counted separately14.95 mAllow 18.7 m of fixed cable, including 2 m slack and 10% reserve, rounded per run.
D04Wired desk outlet1South desk 04Fixed solid-copper Cat6; patch cords counted separately15.35 mAllow 19.1 m of fixed cable, including 2 m slack and 10% reserve, rounded per run.
D05Wired desk outlet1South desk 05Fixed solid-copper Cat6; patch cords counted separately17.35 mAllow 21.3 m of fixed cable, including 2 m slack and 10% reserve, rounded per run.
D06Wired desk outlet1South desk 06Fixed solid-copper Cat6; patch cords counted separately19.35 mAllow 23.5 m of fixed cable, including 2 m slack and 10% reserve, rounded per run.
AP01Wi-Fi access point1Open-office ceilingFixed solid-copper Cat6; patch cords counted separately10.1 mAllow 13.4 m of fixed cable, including 2 m slack and 10% reserve, rounded per run.
CAM01PoE camera1EntranceFixed solid-copper Cat6; patch cords counted separately14.4 mAllow 18.1 m of fixed cable, including 2 m slack and 10% reserve, rounded per run.
CAM02PoE camera1Common areaFixed solid-copper Cat6; patch cords counted separately11.3 mAllow 14.7 m of fixed cable, including 2 m slack and 10% reserve, rounded per run.
ACS01Door-controller LAN1Near the entranceFixed solid-copper Cat6; patch cords counted separately15.6 mAllow 19.4 m of fixed cable, including 2 m slack and 10% reserve, rounded per run.
AV01Meeting-host LAN1Meeting room, call hostFixed solid-copper Cat6; patch cords counted separately20.45 mAllow 24.7 m of fixed cable, including 2 m slack and 10% reserve, rounded per run.
AP02Wi-Fi access point0Meeting-room ceiling, trial positionFixed solid-copper Cat6; patch cords counted separately16.6 mNot installed; select only after trials. Allow 20.5 m of fixed cable, including 2 m slack and 10% reserve, rounded per run.
MDF01Central equipment and cabling rack1MDF rack in the separate IT roomNo additional permanent Cat6 run—Size ventilation, bonding and working clearance for the actual equipment; no IDF rack.
RG01Gateway / firewall1MDF rack in the separate IT room1 × 1 m Cat6 patch cord to SW01—Uses 1 switch port; WAN cabling depends on the actual Internet service and is not metre-estimated.
SW01Managed 16-port RJ45 switch1MDF rack in the separate IT roomNo additional permanent Cat6 run—13 used ports; 14 with AP02, leaving 2 spare. Require at least 4 compatible PoE ports and adequate budget for selected devices.
PP0124-position Cat6 patch panel1MDF rack in the separate IT room11 active runs; 12 with AP02—11 terminated positions and 13 unused; optional AP02 uses position 12. Match panel/run/switch labels; gateway/NVR use local cabinet cords.
NVR01Network video recorder1MDF rack in the separate IT room1 × 1 m Cat6 patch cord to SW01—Select channels, bitrate and disks for retention; separate power, no assumed RAID or PoE.
UPS01Backup power for in-rack equipment1MDF rack in the separate IT roomNo additional permanent Cat6 run—Size from real load, power factor and required runtime. No runtime promise; assess lock power separately.
PSUACS01Separate controller DC supply1Inside the door-control areaLocal branch lengths require a survey; interface, conductor size and supply follow the selected equipment. These quantities are separate from Cat6 and the provisional cable allowances.—One dedicated controller DC supply, outside the PoE budget; match voltage, load and protection to the equipment.
PSULOCK01Separate lock power supply1Near the door, subject to PSU layoutDC cable sized for current / voltage drop; length open—Separate from switch PoE; confirm safety and power-loss behaviour with a qualified person.
LOCK01Illustrative electromagnetic lock + armature1Entrance doorPower from PSULOCK01; control matched to the door system—No selected device model, voltage, current, lock state on power loss or egress circuit.
READER01Credential reader1Near the entranceMatched reader bus; length open—No assumed OSDP / Wiegand interface.
EXIT01Exit button / suitable exit device1Inside the entranceI/O per door design; length open—Does not replace the building’s exit and safety design.
USB01USB table speakerphone16-seat meeting tableProvisional 2.5 m local USB cable1.8 mCoordinate route 1.8 m; check connector and device limits. No separate LAN port.
PATCH-ACTIVEActive Cat6 patch cords24Both ends of 11 runs + 2 local rack linksTotal 29.5 m; separate from the 210.2 m fixed cable—11 × 1 m at MDF; endpoints: 6 × 2 m, AP 0.5 m, 2 cameras × 0.5 m, ACS 1 m, AV 2 m; RG and NVR add 2 × 1 m. Optional AP02 adds 2 cords / 1.5 m.

Quantity and power checks

  • Each Cat6 route sums coordinate-based segments, including vertical sections. Fixed-cable allowance = round up to 0.1 m of (route + 2 m slack) × 1.10. Slack is fixed cable, not a separate patch cord.
  • 11 active runs: 168.65 m route + 22 m slack + 19.065 m reserve + 0.485 m rounding = 210.2 m fixed Cat6. The longest route, AV01, is 20.45 m with a 24.7 m cable allowance.
  • Optional AP02: 16.6 m route + 2 m slack + 1.86 m reserve + 0.04 m rounding = 20.5 m. Fixed cable with AP02 would total 230.7 m.
  • Active SW01 ports = 6 desks + AP01 + 2 cameras + ACS01 + AV01 + NVR01 + gateway RG01 = 13. AP02 raises this to 14 / 16, leaving 2 spare. PoE serves 3 active devices, or 4 with AP02.
  • Separate Cat6 patch cords: 24 cords totalling 29.5 m; AP02 adds 2 cords / 1.5 m. The gateway and NVR each use a 1 m cord already included in 29.5 m; these are not permanent runs.
  • PoE watts remain open until models are selected. Provisional criterion: PSE budget ≥ 1.20 × the sum of maximum port allocations required by the chosen devices / modes. The 20% headroom is a design assumption; still check standards and per-port limits.
  • USB01 route: 1.8 m; provisionally allow a compatible 2.5 m cable. Size NVR storage from actual bitrate × retention, channel count and recording mode; no retention period is guaranteed yet.

Network and Wi-Fi: start with seats and tasks

This example assumes 12 people: 6 at fixed wired desks and 6 using laptops over Wi-Fi. The 6 meeting seats are used by the same group, not 6 additional staff. AP01 is the main access point; AP02 is a trial position only if measurements and real calls show that the meeting room needs it.

Port-based principle diagram: front/rear panel interfaces, fixed cabling, patch cords and PoE. Physical installation and tests require actual-equipment verification.
Port-based principle diagram: front/rear panel interfaces, fixed cabling, patch cords and PoE. Physical installation and tests require actual-equipment verification.

MDF means the central cabling and network equipment rack, located in a separate IT room. All runs return to this rack; no intermediate IDF is needed in this one-floor example. The switch uses 13 ports: 11 home-runs, 1 local NVR link and 1 gateway link. AP02 would raise this to 14; start with a managed 16-port switch role and enough compatible PoE ports.

Cat6 runs follow assumed ceiling circulation paths and door crossings, then drop to the outlets. Staff and guests need separate access rules. VLANs organise traffic; firewall rules, ACLs and Wi-Fi settings must be applied and tested to check isolation.

Terminations and patch cords: fixed cabling terminates at the rear of the patch panel; front cords connect to the assigned switch ports. Eleven field runs use eleven rack-side patch cords; endpoint cords and the gateway/NVR connections are recorded separately.

Cabling, power and connections

  • The 11 permanent runs total 168.65 m including vertical sections. Add 2 m slack per run, 10% reserve, then round each run up to 0.1 m: allow 210.2 m of fixed Cat6.
  • AP02 is excluded from installed quantities. If selected after trials, allow 20.5 m of additional fixed cable and 2 patch cords totalling 1.5 m.
  • Endpoint and rack patch cords are separate: 24 cords / 29.5 m in active use. Specify solid-copper Cat6 for permanent runs and suitable factory-made patch cords; confirm cable type for the actual environment.

Checks before handover

  • Certify each permanent link, wiremap and end labels; retain results against D01–AV01. A short route does not replace testing.
  • Trial actual work at all laptop positions and meeting seats; record conditions and results before deciding on AP02.
  • Check ports, each device’s PoE compatibility and the total power budget with all devices operating.
  • Test Staff / Guest access and camera / access permissions; retain configuration and recovery instructions.

Cameras: trial the required view before selecting equipment

CAM01 watches the entrance; CAM02 faces the common area. These positions support reviewing events at the door and circulation space, not an assumed face-identification result or complete office coverage. Keep private areas and the IT room out of view, and trial the actual frame before mounting.

Two PoE cameras connect through a separate network switch to the NVR in the MDF rack. Positions and settings require on-site trials.
Two PoE cameras connect through a separate network switch to the NVR in the MDF rack. Positions and settings require on-site trials.

Both cameras receive data and PoE from SW01. NVR01 is a separate recorder in the MDF, with a short local LAN patch cord and its own power. Match resolution, bitrate, frame rate, channel count and desired retention to the recorder and disks. This principle assumes neither RAID nor built-in NVR PoE.

The image trial should include people walking through the entrance, backlighting and low-light conditions relevant to operating hours. Then check viewing permissions, time synchronisation, playback and export of a sample clip so the manager understands the usable image and storage location.

Cabling, power and connections

  • CAM01 route: 14.4 m; fixed-cable allowance: 18.1 m after slack and reserve. CAM02: 11.3 m / 14.7 m allowance. Both are included in the 210.2 m total.
  • Allow a 0.5 m endpoint patch cord and a 1 m rack patch cord per camera. The 1 m NVR–switch cord is local, not a third camera home-run.

Checks before handover

  • Approve views and private-area exclusions; retain day / low-light samples with test conditions.
  • Check connection loss / recovery, time sync, playback and export with the assigned user roles.
  • Reconcile storage and retention against actual bitrate; document recording mode and remaining limitations.

Door access: entry permissions and everyday exit

The entrance has READER01 outside for entry authentication, EXIT01 inside for an exit request, and ACS01 for access permissions. PSUACS01 supplies controller DC; PSULOCK01 supplies the lock circuit separately. This small-office example has no door-state sensor.

Door function diagram: data LAN, separate controller/lock supplies, REX and scenario-specific door state; the dashed relay is not wiring.
Door function diagram: data LAN, separate controller/lock supplies, REX and scenario-specific door state; the dashed relay is not wiring.

The reader faces the entry approach and the request-to-exit button is inside. Ordinary REX requests an action from the controller; it is not an emergency power-release device. Egress and integrations need a separate design for the door and building.

The controller uses data-only LAN and a separate DC supply; lock power is a distinct branch. Relay contacts control the lock circuit but do not generate power. The dashed line is a functional relationship, not an extra cable, terminal diagram or finalized wiring circuit.

The electromagnetic lock and leaf armature are illustrative and assume suitable leaf/frame supports. The device model, voltage, current, lock state on power loss and egress circuit require project selection. The closed leaf supports mechanical comparison, not an operational simulation or safety approval.

Cabling, power and connections

  • The ACS01 LAN run has a provisional 19.4 m fixed Cat6 allowance; patch cords are counted separately.
  • Local branch lengths require a survey; interface, conductor size and supply follow the selected equipment. These quantities are separate from Cat6 and the provisional cable allowances.
  • Reader and REX use distinct interface groups; cores, conductors and power follow the equipment. The dashed relay shows function and is not used for cable quantities.

Checks before handover

  • Verify device models, supplies, lock load, interfaces and wiring records before installation.
  • Test permissions, ordinary REX and release timing; check door closure directly.
  • Network loss, power loss, emergency release and egress require an authorized project-specific scenario; this diagram does not establish those conditions.

Meeting room: a dependable connection and usable speech

AV01 is the meeting host, which can be a computer or laptop suited to the company’s application. It has one LAN connection to the MDF. USB01 is a table speakerphone with a local USB connection for audio input and output; these roles do not create two LAN ports.

The AV01 meeting host has LAN to the MDF and local USB to the speakerphone. USB is not a 100 V PA speaker line.
The AV01 meeting host has LAN to the MDF and local USB to the speakerphone. USB is not a 100 V PA speaker line.

The coordinate-based USB table route is 1.8 m. This example provisionally allows a 2.5 m cable, but connectors and device limits must be confirmed before purchase. Trial a two-way call from all 6 seats, including normal speech, echo and mute operation. This is neither a vendor-certified meeting room nor a measured acoustic result.

The office example includes no public-address system. A future 100 V PA system needs a separate amplifier, speaker, zone, load and speaker-cable design. Do not connect a 100 V speaker line to LAN, USB or an unsuitable audio input.

Cabling, power and connections

  • AV01 LAN route: 20.45 m; allow 24.7 m of fixed Cat6 within the total. The 2 m endpoint and 1 m rack patch cords are separate.
  • USB01 does not return to the MDF. Use the provisional 2.5 m USB cable only after confirming compatibility. No PA speaker cable is counted because this example has no PA.

Checks before handover

  • Call using the actual application, select the correct microphone / speaker, and test LAN while other devices are active.
  • Trial speech and listening from all 6 seats, mute operation and USB reconnection.
  • Record table layout, levels and audibility limits; show users how to start and end a meeting.

Technical references